6/29/17 – Concrete Sidewalk Projects 2017
On Thursday, June 29, 2017, six bids were received for the 2017 Concrete Sidewalk Projects . Click here to review the Bid Tabulation Sheet.

6/22/17 – Park Center Health and Fitness Shower Renovation 2017
On Thursday, May 25, 2017, two bids were received for the renovation of the Park Center Health and Fitness showers.  At the June 22, 2017 Park Board meeting, this work was awarded to Construction Consulting & Disbursement Services, of Morton Grove, IL in the amount $ $101,190.  Click here to review the Bid Tabulation Sheet.

6/20/17 – Wagner Farm Drainage Project 2017
On Tuesday, June 20, 2017, eleven bids were received for the Wagner Farm Drainage Project. Click here to review the Bid Tabulation Sheet.

5/25/17 – Park Center Health and Fitness Shower Renovation 2017
On Thursday, May 25, 2017, two bids were received for the renovation of the Park Center Health and Fitness showers. Click here to review the Bid Tabulation Sheet.

5/25/17 – Flick Park Sports Lighting Improvements 

On Thursday, May 4, 2017, five bids were received for the installation of sports field lighting at Flick Park. At the May 25, 2017 Park Board meeting, this work was awarded to Barton Electric Inc., of Trenton, IL  in the amount $375,705. Click here to review the Bid Tabulation Sheet.        

3/23/17 – Landscape Plant Material Installation

On Thursday, March 2, 2017, three bids were received for the installation of plant material. At the March 23, 2017 Park Board meeting, this work was awarded to Elanar Construction, of Chicago, IL in the amount $100,840. Click here to review the Bid Tabulation Sheet.

3/23/17 – Diederich Park Drainage Project

On Thursday, March 2, 2017, seven bids were received for the installation of a drainage system at Diederich Park. At the March 23, 2017 Park Board meeting, this work was awarded to Elanar Construction, of Chicago, IL in the amount $38,041.50.  Click here to review the Bid Tabulation Sheet.

3/23/17 – Shade Shelter Installation

On Thursday, March 2, 2017, three bids were received for the installation of shade Shelters. At the March 23, 2017 Park Board meeting, this work was awarded to Elanar Construction, of Chicago, IL in the amount $95,740. Click here to review the Bid Tabulation Sheet.

3/23/17 – Shirts, Uniforms, Bags and Apparel

On Wednesday, February 22, 2017, four bids were received for the Shirts, Uniforms, Bags and Apparel bid. At the March 23, 2017 Park Board meeting, this work was awarded to Sharp Sports of Shorewood, IL in the amount $26,863.29.  Click here to review the Bid Tabulation Sheet. 

3/23/17 – Summer Bus Service

On Wednesday, February 22, 2017, three bids were received for the Summer Bus Service. At the March 23, 2017 Park Board meeting, this work was awarded to First Student of Naperville, IL in the amount $73,312.50.  Click here to review the Bid Tabulation Sheet.

3/23/17 – Tree Removal and Pruning Services 

On Thursday, February 2, 2017, three bids were received for tree removal and pruning services. At the March 23, 2017 Park Board meeting, this work was awarded to Lucas Landscaping & Design Co., of Deerfield, IL.  Click here to review the Bid Tabulation Sheet.

3/23/17 – Basketball / Tennis Projects 

On Friday, January 27, 2017, four bids were received for Basketball and Tennis projects. At the March 23, 2017 Park Board meeting, this work was awarded to 10-S Court Solutions, of Lake Forest IL in the amount $82,463. Click here to review the Bid Tabulation Sheet.

3/23/17 – Seasonal Landscape Maintenance Services.

On Thursday, January 26, 2017, six bids were received for Seasonal Landscape Maintenance Services. At the March 23, 2017 Park Board meeting, this work was awarded to ILT Vignocchi, of Wauconda, IL in the amount of $103,761 for the next three years of service. Click here to review the Bid Tabulation Sheet.

3/23/17 – Henking School Playground Installation

On Thursday, January 26, 2017, seven bids were received for the Henking School Playground project. At the March 23, 2017 Park Board meeting, this work was awarded to Hacienda Landscaping of Plainfield, IL in the amount $71,748. Click here to review the Bid Tabulation Sheet.

2/23/17 – Park Center Wood Gym Floor Refinishing

On Thursday, January 26, 2017, three bids were received for the Park Center Wood Gym Floor Refinishing project. At the February 23, 2017 Park Board meeting, this work was awarded to Manico Flooring, of McHenry, IL in the amount $59,559. Click here to review the Bid Tabulation Sheet.

2/23/17 – Platform Tennis Court Expansion 

On Thursday, January 12, 2017, four bids were received for the Glenview Prairie Club Platform Tennis Court Expansion project.  At the February 23, 2017 Park Board meeting, this work was awarded to Elanar Construction, of Chicago, IL in the amount $537,440.  Click here to review the Bid Tabulation Sheet.

9/22/16 – Asphalt and Concrete Sidewalk Projects

On Thursday, September 1, 2016, four bids were received for the Asphalt and Concrete Sidewalk Projects. At the September 22, 2016 Park Board meeting, this work was awarded to Allstar Asphalt , of Wheeling, IL in the amount $55,405. Click here to review the Bid Tabulation Sheet.

8/25/16 – Golf Turf Equipment

At the August 25, 2016 Park Board meeting, the board approved the purchase of one bunker rake and one 84 inch trim mower from Reinders of Sussex, Wisconsin in the amount of $46,718.53. Click here to review the Bid Tabulation Sheet.

6/23/16 – Cross trainers and AMTs

At the June 23, 2016 Park Board meeting, the board accepted bids for (4) Cross Trainers from LifeFitness, Rosemont, IL in the amount of $13,069.92 and (3) Cross Trainers from Direct Fitness Solutions, Mundelein, IL in the amount of $15,297.50. Click here to review the Bid Tabulation Sheet.

6/23/16 – Baseball Backstop Replacement

On Friday, June 3, 2016, two bids were received for the Baseball Backstop Replacement project. At the June 23, 2016 Park Board meeting, this work was awarded to Action Fence Contractors, of Mundelein, IL in the amount of $91,427.72. Click here to review the Bid Tabulation Sheet.

5/26/16 – Park Center Preschool Carpet Replacement

At the May 26, 2016 Park Board meeting, this work was awarded to the sole bidder, Continental Construction, of Evanston, IL in the amount of $43,312.

5/26/16-Community Park West Lighting Improvements

On Thursday, May 05, 2016, four bids were received for the Community Park West Lighting Improvements. At the May 26, 2016 Park Board meeting, this work was awarded to Barton Electric, of Trenton, IL in the amount of $439,500. Click here to review the Bid Tabulation Sheet.

4/28/16 – Ice Center Renovations

On Thursday, March 31, 2016, three bids were received for the Ice Center Renovations bid. At the April 28, 2016 Park Board meeting, the board accepted the bid from Redmond Construction of Glenview, IL in the amount of $72,583. Click here to review the Bid Tabulation Sheet.

4/28/16 – Summer Bus Service

On Monday, April 4, 2016, two bids were received for the Summer Bus Service bid. At the April 28, 2016 Park Board meeting, the board accepted the bid from Olson Transporation of Gurnee, IL in the amount of $46,475.50. Click here to review the Bid Tabulation Sheet.

4/28/16 – Westbrook Backstop Replacement 

On Friday, February 26, 2016, four bids were received for the Westbrook Backstop Replacement project.    At the April 28, 2016 Park Board Meeting, the Board of Park Commissioners decided not to move forward with this project. Click here to review the Bid Tabulation Sheet.

3/24/16 – Summer T-shirt, Uniform, Bag and Apparel

On Friday, March 4, 2016 eight bids were received for the Summer T-shirt, Uniform, Bag and Apparel bid. At the March 24, 2016 Park Board meeting, the board accepted bids from the following companies: Roselynn Fashions; Sportsdecals Inc.; Sunburst Sportswear; Arena Sports USA, and Marathon Sportswear totaling $23,930.17. Click here to review the Bid Tabulation Sheet.

3/24/16 – Cunliff Tennis Court Drainage 

On Thursday, March 3, 2016 four bids were received for the Cunliff Tennis Court Drainage project. At the March 24, 2016 Park Board meeting, this work was awarded to Elanar Construction, of Chicago, IL in the amount of $26,188 for the Base Bid items and Alternates #1a, 1c, 1d, & 1e. Click here to review the Bid Tabulation Sheet.

3/24/16 – Parking Lot Pavement Marking and Crack Fill 

On Thursday, March 3, 2016 four bids were received for the Parking Lot Pavement Marking and Crack Fill project. The Glenview Park District has awarded this work to the lowest bidder, Patriot Pavement Maintenance, of Des Plaines, IL in the amount of $10,334, for the Base Bid items and Alternates #1a & 1b. Click here to review the Bid Tabulation Sheet.

3/24/16 – Shade Structure Installation 

On Friday, February 26, 2016, six bids were received for the Shade Structure Installation project.  At the March 24, 2016 Park Board meeting, this work was awarded to Elanar Construction, of Chicago, IL in the amount of $28,480  for the Base Bid items. Click here to review the Bid Tabulation Sheet.

3/24/16 – Concrete Sidewalk Installation 

On Friday, February 26, 2016, seven bids were received for Concrete Sidewalk Installation. At the March 24, 2016 Park Board meeting, this work was awarded to Continental Construction Company, Inc., of Evanston, IL in the amount of $73,960  for the Base Bid items and Alternates #1 & 2. Click here to review the Bid Tabulation Sheet.

3/24/16 – Gallery Park Rubber Surfacing Installation 

On Thursday, February 25, 2016, one bid was received for the Gallery Park Rubber Surfacing Installation. At the March 24, 2016 Park Board meeting, this work was awarded to Elanar Construction, of Chicago, IL in the amount of $55,147.50 for the Base Bid items and Alternates #1-3. Click here to review the Bid Tabulation Sheet.

3/24/16 – Basketball/Tennis Projects 

On Thursday, February 25, 2016, three bids were received for Basketball/Tennis projects. At the March 24, 2016 Park Board meeting, this work was awarded to 10-S Court Solutions, of Lake Forest, IL in the amount of $153,288  for the Base Bid items and Alternates #1,2 & 5. Click here to review the Bid Tabulation Sheet

3/24/16 – Landscape Plant Material Installation 

On Thursday, February 25, 2016, three bids were received for Landscape Plant Material Installation. At the March 24, 2016 Park Board meeting, this work was awarded to Elanar Construction, of Chicago, IL in the amount of $178,691  for the Base Bid items and Alternate #1. Click here to review the Bid Tabulation Sheet.

3/24/16 – Grove Parking Lot Solar Lighting 

On Thursday, February 25, 2016, four bids were received for the Grove Parking Lot Solar Lighting. At the March 24, 2016 Park Board meeting, this work was awarded to Utility Dynamics Corporation, of Oswego, IL in the amount of $38,700  for the Base Bid items. Click here to review the Bid Tabulation Sheet.

 

2/25/16 – Park Center Splash Roof and HVAC Replacements

The District opened bids for the Park Center Splash Roof and the HVAC Replacements on January 20, 2016. A total of ten bids were received. At the February 25, 2016 board meeting, the Glenview Park District Board of Commissioners awarded the bid to A1 Roofing. Click here to review the Bid Tabulation Sheet.

12/1/15 – Golf Car Lease 2015

On Tuesday, December 1, 2015, three bids were received for the Golf Car Lease. Click here to review the Bid Tabulation Sheet.

9/17/15 – Compact Articulated Loader 2015

On Thursday, September 17, 2015, two bids were received for a Compact Articulated Loader. Click here to review the Bid Tabulation Sheet.

8/27/15 – Flick Park Arboretum Renovation 2015

On Thursday, July 30th, 2015, four bids were received for the Flick Park Arboretum Renovation 2015. At the August 27, 2015 Park Board Meeting, this work was awarded to Hacienda Landscaping, of Plainfield, IL in the amount of $167,453.00. Click here to review the Bid Tabulation Sheet.

7/23/15 – Tennis Club Roof Repair

On July 10, 2015, four bids were received for the Tennis Club Roof Repairs.  At the July 23, 2015 Park Board Meeting, this work was awarded to National Roofing of Chicago, Illinois in the amount of $188,300. Click here to review the Bid Tabulation Sheet.

7/23/15 – Tree Removal and Pruning Services

On Thursday, July 2, 2015, Four bids were received for Tree Removal and Pruning Services. At the July 23, 2015 Park Board Meeting, this work was awarded  to the following companies for tree removal and pruning services: The “per inch” unit prices submitted in the bid, from Homer Tree Care, Inc., Lockport, IL for tree removal services at park locations for trees up to, and including 30’’,  and Alternates #1(The Grove driveway/parking lot) & #2(The Grove, limited access); and the “per inch” unit prices submitted in the bid from Trees “R” Us, Inc., Wauconda, IL for tree removal services at park locations for trees over 30” and Alternate #3 (The Grove limited access/cut into 16”lengths) and for the “per hour” cost for a pruning crew. Click here to review the Bid Tabulation Sheet. Click here to review the Bid Tabulation Sheet.

6/25/15 – Glenview Tennis Club Backdrop & Divider Curtain Project

On Thursday, June 11, 2015, two bids were received for the Glenview Tennis Club Backdrop & Divider Curtain Project 2015. At the June 25, 2015 Park Board Meeting, this work was awarded to Sports Interiors, Inc. of Prairie View, IL in the amount of $29,540. Click here to review the Bid Tabulation Sheet.

6/25/15 – Park Center Roof Repair

Four bids were received the the Park Center Roof Repairs project. At the Thursday, June 25, 2015 Park Board Meeting, this work was awarded to Malcor Roofing, Inc. in the amount of $30,000.

5/28/15 – Ice Center HVAC Rooftop Replacement

At the Thursday, June 25, 2015 Park Board Meeting, this work was awarded to National Heat & Power, Inc. in the amount of $145,000.

5/7/15 – Grove Archives Addition

On Thursday, May 7th, six bids were received for the Grove Archives Addition. At the June 25, 2015 Park Board Meeting, this work was awarded to Action One Construction, of Chicago, IL in the amount of $145,000. Click here to review the Bid Tabulation sheet.

4/23/15 – Glenview Park Golf Club Turf Equipment

Four bids were received for the Glenview Park Golf Club Turf Equipment. At the April 23, 2015 Park Board Meeting, this work was awarded to Reinders, Inc. in the amount of $242,329, for four walking greens mowers, one trim mower, one utility vehicle, and one sprayer for the Glenview Park Golf Club along with two utility vehicles and one sprayer for the Prairie Club. Click here to review the Bid Tabulation sheet.

4/16/15 – Glenview Park Golf Club Clubhouse Furniture

On Thursday, April 16, one bid was received for Glenview Park Golf Club Clubhouse Furniture. At the April 23, 2015 Park Board Meeting, this work was awarded to Mary Cook and Associates, in the amount of $104,221.07.

4/9/15 – Glenview Golf Club Tree Planting

On Thursday, April 9, seven bids were received for the Glenview Golf Club Tree Planting. At the April 23, 2015 Glenview Park Board Meeting this work was awarded to Elanar Construction, of Chicago, IL  in the amount of $77,797.50. Click here to review the Bid Tabulation Sheet.

3/28/15 – Glenview Park Golf Club Clubhouse Renovation

On the Thursday, March 28 Park Board Meeting, this work was awarded to W.B. Olson in the amount of $1,205,806. W.B. Olson is acting as Construction Manager at Risk and as such, they will hold the competitively bid contracts from the 11 trades involved in the renovation of the clubhouse and will be responsible for delivering the project in its present scope at the GMP or lower. Click here to review the bid tabulation for trades. Painting was awarded to A. Gramer Painting, general trades to Boller Construction, carpet to Flooring Resources, fire protection to Global Fire Protection, plumbing to Goodman Plumbing, electrical to J Hamilton Electric, HVAC to Jensen’s Plumbing, drywall to Kole Construction, ceramic tile to Northern IL Terrazzo, food service to Trimark Marlinn, and demo to W.B. Olson, INC.

3/26/2015 – Facility Services East Garage

At the Thursday, March 26, 2015 Park Board Meeting, the project was awarded to Frederick Quinn Corporation of Addison, IL in the amount of $3,097,237.00.

3/10/15 – Summer Camp Bus

On Tuesday, March 10, 2015 two bids were received for Summer Camp Bus. At the March 26, 2015 Glenview Park Board Meeting this work was awarded to First Student Inc., Naperville, IL, in the amount of $66,088.75. Click here to review the Bid Tabulation sheet.

3/3/15 – Uniforms and Camp T-Shirts

On Tuesday, March 3, 2015 seven bids were received for Uniforms and Camp T-Shirts. Click here to review the Bid Tabulation sheet.

2/26/15 – Park Center Splash Landings Dectron Replacement

Five bids were received for the Park Center Pool Repair project. On Thursday, February 26, 2015 Park Board Meeting, this work was awarded to Amber Mechanical, Inc. in the amount of $519,000. Click here to review the Bid Tabulation sheet.

2/26/15 – Natatorium HVAC Upgrades & Remodel 2015

On Thursday, February 19, 2015, five bids were received for the Natatorium HVAC Upgrades & Remodel Project. At the February 26, 2015 Glenview Park Board Meeting this work was awarded to Amber Mechanical Contractors Inc., of Alsip, IL in the amount of $519,000  Click Here to review the bid tabulation sheet.

2/26/15 – Flick Park Storm Sewer Improvements 2015

On Friday, February 13, 2015, eight bids were received for the Flick Park Storm Sewer Improvements. At the February 26, 2015 Glenview Park Board Meeting this work was awarded to Subsurface Underground Construction Inc., of Elgin, IL in the amount of $85,150. Click here to review the bid tabulation sheet.

2/26/15 – Waste Disposal and Recycling Services

On Thursday, February 12, 2015, three bids were received for  Waste Disposal and Recycling Services. At the February 26, 2015 Glenview Park Board Meeting this work was awarded to  Waste Management, of Batavia, IL in the amount of $114,780. Click here to review the bid tabulation sheet.

2/26/15 – Cunliff Park Playground Installation 2015

On Thursday, February 12, 2015, four bids were received for the Cunliff Park playground renovation. At the February 26, 2015 Glenview Park Board Meeting this work was awarded to Elaner Construction Co., of Chicago, IL in the amount of $139,934. Click here to review the bid tabulation sheet.

2/26/15 – Westbrook Backstop Replacement 2015

On Thursday, January 29th, 2015, three bids were received to replace the Westbrook baseball backstops. At the February 26, 2015 Glenview Park Board Meeting this work was awarded to Classic Fence, of Oswego, IL in the amount of $89,176. Click here to review the bid tabulation sheet.

2/26/15 – Basketball/Tennis Projects 2015

On Thursday, January 29th, 2015, three bids were received for crack repair and colorcoating at the Rugen Park tennis & basketball courts, and resurfacing at the Indian Ridge and Gallery Park tennis courts. At the February 26, 2015 Glenview Park Board Meeting this work was awarded to 10-S Court Solutions, of Lake Forest, IL in the amount of $24,430 for the Base Bid work and Alternates 6a – 6c and to First Impression, Inc. of Franklin Park, IL in the amount of $105,847.80 for Alternates #1 – 5. Click here to review the bid tabulation sheet.

11/20/14 – Sleepy Hollow Bridge Replacement

On Wednesday, November 12, 2014, ten bids were received for the Sleepy Hollow Bridge Replacement project.  At the November 20, 2014, Glenview Park Board meeting this work was awarded to Schaefges Brothers, Wheeling, IL in the amount of $103,675.   The expected timeframe is three weeks for shop drawings to be completed, and then three months for the bridge fabrication. The installation is expected to take one day, with a crane onsite to remove the old bridge, and then place the new bridge.  They anticipate complete replacement by spring of 2015.  Click here to review the bid tabulation sheet.

4/24/14 – Park Center Health and Fitness Treadmills

On Thursday, January 30, 2014, two bids were received for the replacement of treadmills at the Park Center Health and Fitness facility. At the April 24, 2014, Glenview Park Board meeting this purchase was awarded to both companies, Life Fitness of Schiller Park, Il for 7 items totaling $44,099.66 and Direct Fitness Solutions of Mundelein, IL for 5 items totaling $36,375. Click here to review the bid tabulation sheet. 4/24/14 – Purchase of 2014 Backhoe/Loader On Thursday, April 10, 2014 two bids were received for the purchase of a 2014  Cat 420 Backhoe/loader.  At the April 24, 2014, Glenview Park Board meeting this purchase was approved to Patten Industries, Inc. of Elmhurst, IL for $96,595. Click here to review the bid tabulation sheet. 4/24/14 – Tennis and Basketball Court Resurfacing Projects On Thursday, March 27, 2014 seven bids were received for crack repair and color coating at West Fork tennis and basketball Willow tennis and the basketball courts at Cole, Countryside and Community Park West. At the April 24, 2014 Glenview Park Board meeting this work was awarded to U.S. Tennis Court Construction Co of Lockport, IL in the amount of $42,160. Click here to review the bid tabulation sheet. 4/24/14 –  Paving Projects 2014 On Thursday, March 27, 2014 three bids were received for the parking lot and walkway paving projects.  At the April 24, 2014 Glenview Park Board meeting, this work was awarded to Allstar Asphalt of Wheeling, IL in the amount of $57,962 for asphalt and concrete work at the Tennis Club, and to Chicagoland Paving of Lake Zurich, IL in the amount of $49,015 for sealcoating and striping work.  Click here to review the bid tabulation sheet.

3/20/14 – Jackman Park Playground Installation Project

On Thursday, March 13, 2014, six bids were received for the Jackman Park Playground Installation.  This project will expand the existing tot play piece while also offering new and more variety of play equipment for the older kids.  At the March 20, 2014, Glenview Park Board meeting this work was awarded to Elanar Construction Co., Chicago, IL in the amount of $558,794.50. Click here to review the bid tabulation sheet.

3/20/14 – Summer Camp Bus  2014

The Summer Camp Bus bid opening took place on Tuesday, March 4, 2014, with  four companies submitting bids. At the Glenview Park Board meeting held on March 20, 2014, the contract was awarded to Alltown Bus Company, Skokie, IL  in the amount of $34,786.  Click here to review the bid tabulation sheet.

3/20/14 – Summer T-Shirt and Uniform 2014

The T-shirt and Uniform bid opening took place on Tuesday, March 4, 2014, with three companies submitting bids. Upon staff recommendations, at the Glenview Park Board meeting held on March 20, 2014, the purchase awards were  split among the three companies.  Click here to review bid tabulation sheet. 3/20/2014 – Glenview Park Golf Club Renovation Project The Glenview Park Golf Club Renovation project bid opening took place on February 12, 2014.  On March 20, 2014, at the Glenview Park Board meeting the board agreed with the staff recommendation to accept the lowest responsible bids for the four schedules.  The total bid award of $4,411,682.35 was approved with several conditions.  Click here to review the bid tabulation sheet.

2/27/14 – Grove Parking Lot Solar Lighting 2014

On Thursday, February 13, 2014, five bids were received for the Grove Parking Lot Solar Lighting 2014 project. This new sight lighting will replace lighting which had previously been mounted in trees.  Because of the loss of many trees affected by the Emerald Ash Borer the new lighting at The Grove will be mounted on poles and be operated with solar power. At the Glenview Park Board meeting on February 27, 2014, this work was awarded to Adlite Electric Co., Inc. of Des Plaines, IL in the amount of $84,998.  Click here to review bid tabulation sheet.

10/24/13 – Gallery Park Drainage Project

On Tuesday, October 15, 2013, eleven bids were received for the Gallery Park Drainage Project 2013. The project calls for installing sand-filled drain lines throughout the Great Lawn that will collect rain water and send it to a main line. The lawn will benefit from a proper drain system, and the area will be available for use much sooner after it rains. Also, it will be easier to establish a healthy stand of turfgrass. At the Glenview Park Board meeting on October 24, 2013, this work was awarded to Team REIL, Inc. of Union, IL in the amount of $72,503.25.  Click here to review bid tabulation sheet.

9/26/13 – Tree Removal & Pruning Services

On September 12, 2013 two bids were received for Tree Removal & Pruning Services. This work involves removing Ash trees in the Parks, at The Grove and at the Golf Club which have died as a result of the Emerald Ash Borer. Contractors submitted “per inch” pricing depending on the diameter size of the trunk. At the Park Board meeting on September 26, 2013, the following was approved: 1) The “per inch” unit prices submitted in the bid from Trees “R” Us, Inc. of Wauconda, IL for tree removal services at Park locations and the Glenview Park Golf Club, plus acceptance of the “per hour” cost for a Pruning Crew. 2) The “per inch” unit prices submitted in the bid from Clean Cut Tree Service, Inc. of Grayslake, IL for tree removal services at The Grove. Click here to review bid tabulation sheet.